Follow the the table of content listed below and use the PRINCE2 methodology :
Section1 – PROJECT PLAN
TASK 1 -A Business Case
1.1 A brief rationale for the project
1.2 Summary of benefits
1.3 Current Problem, proposed solution and alternatives
1.4 Cost/Benefit analysis
TASK 1B – Project Initiation Document
B.1 Purpose of PID
B.2 Case Study Background
B.3 Project Objectives
B.4 Project Management Structure and Role Descriiptions
B.5 Constraints
B.6 Assumptions
B.7 Interfaces
B.8 Project approach
B.9 Scope
B.10 Quality Criteria
B.11 Risk management approach
B.12 Communication strategy
B.13 Project Controls
TASK 2 – Project Plan
2.1 Project Plan
2.2 Work Based Structure
2.3 Critical Path Analysis
TASK 3 – Approaches to Project
Section 2 – REFLECTION